lily@tiegong.net

+86-416-7996209

Product Categories

Contact Us

Address: No. 837, Xingshan Town, ETDZ, Jinzhou City, Liaoning Province, China

TEL: 86-416-7996209

FAX: 86-416-7996210

Mobile:+86-138-9837-8811

Email: lily@tiegong.net
        

Home > Knowledge > Content
Knowledge of Thermit Welding Jun 21, 2018

Knowledge of Thermit Welding

1.png


Prepare Work:

When preparing for welding, starting with the rails on both sides of the weld, each side releases 2-4 sets of fasteners, and then fastens rail fasteners within a range of at least 50 m according to the specification, In order to observe whether the rail is moving or not, the first locking fastener on both sides of the weld can be welded by hot aluminum welding.

02.jpg

2.png



Rail End Drying:

During the operation of thermit welding, it is necessary to heat and dry the rail in the range of 0.5 meters on both sides of the weld with preheater gun before installation of sand mold, so as to fully remove the moisture on the rail surface.

3.png



GDII rail alignment frame